Dark Reading is part of the Informa Tech Division of Informa PLC

This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them.Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.

Risk

Space Shuttle Suffers Radar Outage

Operational "anomaly" means Discovery astronauts will have to dock with space station without help from electronics system.

Astronauts aboard the space shuttle Discovery will have to depart from some standard operating procedures due to balky electronics. NASA, however, said their safety is not in peril.

The shuttle's Integrated Radar and Communications System, or "Ku band" radar, experienced what NASA officials called an "anomaly" shortly after the spacecraft's liftoff early Monday from Kennedy Space Center in Florida.

Astronauts use the radar to assist them in docking with the International Space Station, which Discovery is slated to rendezvous with Tuesday afternoon. NASA, however, said it's confident that the radar's malfunction isn't cause for concern.

"Pilot astronauts are trained to rendezvous without radar," NASA said in a statement.

But docking isn't the only area where the glitchy radar is causing problems. Astronauts aboard the shuttle typically use the system, developed by the former Hughes Aircraft Company (now part of Boeing), to transmit mission images to ground controllers on Earth.

The astronauts will now have to use the space station's Ku band system to send images, including those taken of the crew's critical heat-shield inspection.

Discovery and its seven-member crew launched from Kennedy at 6:21 a.m. Monday. The 13-day mission, officially known as STS-131, will see the crew perform three spacewalks. They'll also dock with the ISS to deliver the Leonardo multi-purpose logistics module containing science racks for use in the various labs throughout the station.

The module also contains new sleeping quarters and other supplies.

The astronauts will also collect a Japanese science experiment and switch out a gyro assembly on part of the station's truss structure.

Discovery is commanded by U.S. Navy Captain Alan Poindexter, 48, of Rockville, MD. Three of the crewmembers—pilot Jim Dutton, mission specialist Dottie Metcalf-Lindenburger, and mission specialist Naoko Yamakazi of the Japanese Space Agency—are making their first flights into space.

Only three more shuttle flights remain before the vehicles are retired at the end of this year. Under a plan put forth by the Obama Administration, NASA will effectively outsource transportation of crew and supplies to the ISS to private launch contractors.

InformationWeek has published an in-depth report based on its 2010 IT Salary Survey. Download the report here (registration required).

Comment  | 
Print  | 
More Insights
Comments
Newest First  |  Oldest First  |  Threaded View
News
A Startup With NSA Roots Wants Silently Disarming Cyberattacks on the Wire to Become the Norm
Kelly Jackson Higgins, Executive Editor at Dark Reading,  5/11/2021
Edge-DRsplash-10-edge-articles
Cybersecurity: What Is Truly Essential?
Joshua Goldfarb, Director of Product Management at F5,  5/12/2021
Commentary
3 Cybersecurity Myths to Bust
Etay Maor, Sr. Director Security Strategy at Cato Networks,  5/11/2021
Register for Dark Reading Newsletters
White Papers
Video
Cartoon Contest
Write a Caption, Win an Amazon Gift Card! Click Here
Latest Comment: Google Maps is taking "interactive" to a whole new level!
Current Issue
2021 Top Enterprise IT Trends
We've identified the key trends that are poised to impact the IT landscape in 2021. Find out why they're important and how they will affect you today!
Flash Poll
How Enterprises are Developing Secure Applications
How Enterprises are Developing Secure Applications
Recent breaches of third-party apps are driving many organizations to think harder about the security of their off-the-shelf software as they continue to move left in secure software development practices.
Twitter Feed
Dark Reading - Bug Report
Bug Report
Enterprise Vulnerabilities
From DHS/US-CERT's National Vulnerability Database
CVE-2020-18194
PUBLISHED: 2021-05-17
Cross Site Scripting (XSS) in emlog v6.0.0 allows remote attackers to execute arbitrary code by adding a crafted script as a link to a new blog post.
CVE-2020-18195
PUBLISHED: 2021-05-17
Cross Site Request Forgery (CSRF) in Pluck CMS v4.7.9 allows remote attackers to execute arbitrary code and delete a specific article via the component " /admin.php?action=page."
CVE-2020-18198
PUBLISHED: 2021-05-17
Cross Site Request Forgery (CSRF) in Pluck CMS v4.7.9 allows remote attackers to execute arbitrary code and delete specific images via the component " /admin.php?action=images."
CVE-2020-21831
PUBLISHED: 2021-05-17
A heap based buffer overflow vulnerability exists in GNU LibreDWG 0.10 via read_2004_section_handles ../../src/decode.c:2637.
CVE-2020-21842
PUBLISHED: 2021-05-17
A heap based buffer overflow vulnerability exists in GNU LibreDWG 0.10 via read_2004_section_revhistory ../../src/decode.c:3051.